Cycle / scooter circuit complete – almost

The paths and grass areas of the new children’s cycle and scooter circuit were finished in early June. The temporary safety fencing is still in place, which makes it look unfinished but it is safe to use. We’re waiting for the Council to confirm if they can install the proper railings now, or if they have to wait until the Autumn, after the MUGA is installed, when they’ll be able to rail the entire length of the old tennis courts. We would prefer the new railings in place now.

However, the space is ready and some people have already ventured in to jog, skate, scoot and ride bikes. There’s a gap in the fencing next to the gym where you can get in.

And remember, the children’s play/exercise areas are all dog-free zones.